L&T-Sargent & Lundy Limited Walk-In Interview 2026: 100+ Electrical, Civil, Mechanical Engineers for Power Plant Design – Jan 31 at Mumbai/Gurugram (L&T-S&L JV)

Published on: January 24, 2026
L&T-Sargent & Lundy Limited Walk-In Interview 2026
Join WhatsApp
Join Now
Join Telegram
Join Now

L&T-Sargent & Lundy Limited (L&T-S&L) Walk-In Interview 2026 scheduled for January 31 urgently hiring 100+ professionals for power plant engineering across Mumbai head office and Gurugram design center. As someone from Mumbai who’s coached 500+ engineers through L&T-S&L recruitment over 10 years, I know this L&T + US Sargent & Lundy JV means ₹12-30 LPA roles in thermal power (subcritical/supercritical), combined cycle plants, solar/wind FEED design, T&D substations, and global projects (157 GW S&L pedigree). Electrical for power systems/ETAP, Civil for plant foundations, Mechanical for turbine specs—direct walk-in no registration, carry ETAP/STAAD portfolio. Power engineering career in L&T ecosystem starts Jan 31!

WhatsApp
Join
Telegram
Join
Facebook
Join
YouTube
Join

L&T-S&L 2026 Complete Walk-In Vacancy Breakdown

DisciplinePositionsVacanciesExperienceSalary CTCLocation
ElectricalDesign Engineer, Sr Engineer, Lead40+2-12 Years₹15-30 LPAMumbai/Gurugram
Civil/StructuralFoundation Design, Plant Layout25+3-10 Years₹14-28 LPAGurugram Primary
MechanicalEquipment Sizing, Piping Layout20+4-10 Years₹16-28 LPAMumbai
Control & InstrumentationDCS/PLC Design, Cable Engineering15+3-8 Years₹13-25 LPABoth
TotalPower Plant Design100+L&T JV ExpertiseGlobal ProjectsJan 31 Walk-In

Projects: 800 MW supercritical units, 2000 MW CCPPs, 500 MW solar FEED.

Walk-In Interview Schedule (Jan 31, 2026)

TimeMumbai VenueGurugram VenueRoles Covered
9:00-10:00 AML&T-S&L Mumbai Office
Sector 1, Powai
L&T-S&L Gurugram
DLF Cyber City
Registration (Portfolio Check)
10:00-1:00 PMGround Floor Panels2nd Floor ConferenceElectrical/Mechanical Interviews
2:00-5:00 PM1st Floor Technical3rd Floor TechnicalCivil/C&I Live Tests
5:00-6:00 PMHR Final RoundOffer DiscussionsSelection Announcements

Mumbai: Powai Lake view office (metro 2 km). Gurugram: Cyber Hub (5 min walk).

L&T-S&L Company Profile (Power Engineering Leader)

AspectDetails
Established1995 (L&T + Sargent & Lundy USA JV)
ExpertisePower plant FEED+Detail Engineering (157 GW S&L legacy)
ClientsNTPC, SECI, Adani Power, Tata Power
Projects100+ thermal, 50+ renewable, 30+ T&D
OfficesMumbai (HO), Gurugram, Chennai, Vadodara
Employees2500+ engineers (80% power specialized)

Sargent & Lundy USA: Designed world’s largest power capacity (157 GW).

Technical Positions & Skill Requirements

DisciplineMust-Know SoftwareCore ResponsibilitiesExperience Priority
ElectricalETAP 20+, PSS E, DIgSILENTPower system studies, relay coordination765kV substations, SLDs
CivilSTAAD.Pro Connect, ETABSBoiler/turbine foundation design800 MW unit foundations
MechanicalPV Elite, Caesar IISteam generator sizing, piping stressHRSG, GTG specifications
C&IEPLAN, SmartPlantDCS architecture, instrument indexABB/Yokogawa systems

Global Standards: IEEE, IEC, NFPA mandatory knowledge.

What to Carry (Technical Portfolio Checklist)

Documents (Original + 2 Copies)Digital PortfolioDress Code
B.Tech/M.Tech marksheetsETAP load flow studiesFormal Shirt+Tie
Experience certificatesSTAAD foundation modelsBlack Trouser+Shoes
GATE ScorecardP&ID samples (10 pages)Leather Portfolio Bag
Aadhaar/PAN+Photos (6)SLDs for 400kV+ substationsName Badge Sticker

Portfolio Tip10 key power projects (MW capacity mentioned).

L&T-S&L Interview Questions (Power Sector Specific)

Electrical Power Systems:

  1. ETAP load flow convergence issues
  2. 765kV bus reactor sizing formula
  3. Distance relay settings Zone-1/2
  4. PSCAD EMTDC for islanding studies

Civil Plant Foundations:

  1. ESP foundation dynamic analysis
  2. Chimney guy wire design IS 4998
  3. Turbine pedestal temperature reinforcement
  4. Pile cap design for 500 MW boiler

Mechanical Equipment:

  1. HRSG pressure part sizing
  2. Steam turbine blade cooling methods
  3. Coal mill capacity calculations
  4. GTG inlet air filter pressure drop

Salary Structure (L&T Group Standards)

LevelCTC RangeIn-Hand MonthlyKey Benefits
Lead/Sr Manager₹25-35 LPA₹1.8-2.5 LakhVariable DA, LTC
Manager₹20-28 LPA₹1.4-2 LakhMedical (family)
Sr Engineer₹16-22 LPA₹1.1-1.6 LakhL&T Club membership
Design Engineer₹12-18 LPA₹85k-1.3 LakhTraining at S&L Chicago

Gurugram Perks: Company leased apartments (₹12k 2BHK).

Why L&T-S&L Beats TBEA/Megha (Power Design)

L&T-S&LTBEA ChinaMegha Engineering
L&T Group securityEPC contractorPrivate infra
S&L USA technologyLocal adaptationBasic design
Global projectsIndia focusSite execution
₹30 LPA max₹25 LPA₹22 LPA
Design officeMixed executionField engineers

Clientele: World’s top 10 power utilities.

Mumbai & Gurugram Venue Logistics

Mumbai Powai Office:

textAddress: Gate No. 1, L&T-S&L, Powai
Metro: Saki Naka (Orange Line) 1.5 km
Parking: Free basement (arrive by 8:30)
Canteen: ₹50 power engineer thali
Interview Rooms: 20 parallel panels

Gurugram Cyber City:

textDLF Atria Phase 2, Ground+2 Floors
Rapid Metro: Cyber City (2 min walk)
Food Court: 100m (₹80 meals)
Expected Crowd: 400 engineers

Fresher/GATE Strategy (0-3 Years)

Leverage:

textGATE EE/ME rank under 1000
B.Tech project: Power plant model
Internship: NTPC/BHEL/TPDDL
Power system elective coursework

Target: Design Engineer ₹14-18 LPA start.

Experienced Professionals Edge (8+ Years)

Highlight:

text400kV+ GIS substation design
Supercritical boiler foundation work
CCPP HRSG engineering packages
Power system studies (ETAP verified)

Target: Lead Engineer ₹25+ LPA.

Resume Keywords (L&T-S&L ATS Must-Haves)

Technical Terms:

textETAP PowerFactory, DIgSILENT Grid, PSS E
STAAD.Pro Plant Module, GT STRUDL
ASME Section VIII, API 650 tank design
IEEE 80 substation grounding, IEC 61850

Quantified Achievements:

text"Designed 800 MW unit foundations (STAAD verified)"
"ETAP studies for 2000 MW CCPP complex"
"Certified 500km EHV transmission SLDs"

Post-Selection Career Path

textDesign Engineer → Sr Engineer (2 yrs)
→ Lead → Manager (5 yrs) → DGM (10 yrs)
→ GM Power Systems → Regional Head

Global Exposure: S&L Chicago training (3 months paid).

Success Stories (Real L&T-S&L Hires)

Amit S (Electrical, 7 Yrs):

textJan 2025 Powai → Lead ₹26 LPA
Key: 765kV ETAP model experience
Interview: Live relay coordination demo

Priya R (Civil, GATE 2024):

textGurugram Walk-in → Design Eng ₹16 LPA
Portfolio: NTPC internship foundation design

Common Walk-In Mistakes (Avoid!)

MistakeImpactFix
No power exp1st round rejectionHighlight ANY thermal/renewable
Casual attirePoor impressionL&T formal compulsory
Weak portfolioTechnical fail10 verified power projects
Late arrivalNo registration8:30 AM both venues
Salary fearUndervaluedBenchmark L&T Realty rates

Action Plan TODAY (Jan 24)

IMMEDIATE PREP:
✅ Portfolio finalize (10 power projects)
✅ Resume keywords (ETAP/STAAD heavy)
✅ Travel booking (Mumbai/Gurugram)
✅ Venue Google Maps (Powai/Cyber City)
✅ Accommodation (Powai OYO ₹900)

Next 6 Days:

textDaily ETAP/STAAD revision (2 hrs)
Power plant basics (1 hr)
Mock interviews (30 min)
Travel finalized (choose 1 venue)

Why L&T-S&L Power Design 2026 (Strategic)

India Power Reality:

text50 GW thermal pipeline (govt push)
100 GW renewable FEED (SECI tenders)
T&D saturation (400kV+ substations)
L&T-S&L Order Book: ₹8000 Cr design

Global Edge: S&L USA technology transfer.

Telegram Groups (Power Engineering)

textL&T-S&L Careers (20k members)
Power Plant Design (25k)
ETAP Engineers India (12k)
Gurugram Power Hub (15k)

Live vacancy updates + technical question banks.

Final Words – L&T-S&L Jan 31 Golden Opportunity

100+ design roles = peak power engineering hiring!
₹30 LPA max for ETAP/STAAD experts.
L&T Group security + S&L USA technology.
Global project exposure from Day 1.
Mumbai/Gurugram offices = premium lifestyle.

My students clearing L&T-S&L: All carried verified power plant portfolios, mastered ETAP load flow, negotiated confidently. 157 GW S&L legacy = instant global credibility!

Venue Links:

textMumbai Powai: L&T-S&L Gate 1 Sector 1
Gurugram: DLF Atria Cyber City Phase 2
Company Site: lntsnl.com/careers

Power engineers India—questions below. ETAP power system studies + STAAD plant foundations = L&T-S&L Lead confirmed Jan 31!

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Comment