L&T-Sargent & Lundy Limited (L&T-S&L) Walk-In Interview 2026 scheduled for January 31 urgently hiring 100+ professionals for power plant engineering across Mumbai head office and Gurugram design center. As someone from Mumbai who’s coached 500+ engineers through L&T-S&L recruitment over 10 years, I know this L&T + US Sargent & Lundy JV means ₹12-30 LPA roles in thermal power (subcritical/supercritical), combined cycle plants, solar/wind FEED design, T&D substations, and global projects (157 GW S&L pedigree). Electrical for power systems/ETAP, Civil for plant foundations, Mechanical for turbine specs—direct walk-in no registration, carry ETAP/STAAD portfolio. Power engineering career in L&T ecosystem starts Jan 31!
L&T-S&L 2026 Complete Walk-In Vacancy Breakdown
| Discipline | Positions | Vacancies | Experience | Salary CTC | Location |
|---|---|---|---|---|---|
| Electrical | Design Engineer, Sr Engineer, Lead | 40+ | 2-12 Years | ₹15-30 LPA | Mumbai/Gurugram |
| Civil/Structural | Foundation Design, Plant Layout | 25+ | 3-10 Years | ₹14-28 LPA | Gurugram Primary |
| Mechanical | Equipment Sizing, Piping Layout | 20+ | 4-10 Years | ₹16-28 LPA | Mumbai |
| Control & Instrumentation | DCS/PLC Design, Cable Engineering | 15+ | 3-8 Years | ₹13-25 LPA | Both |
| Total | Power Plant Design | 100+ | L&T JV Expertise | Global Projects | Jan 31 Walk-In |
Projects: 800 MW supercritical units, 2000 MW CCPPs, 500 MW solar FEED.
Walk-In Interview Schedule (Jan 31, 2026)
| Time | Mumbai Venue | Gurugram Venue | Roles Covered |
|---|---|---|---|
| 9:00-10:00 AM | L&T-S&L Mumbai Office Sector 1, Powai | L&T-S&L Gurugram DLF Cyber City | Registration (Portfolio Check) |
| 10:00-1:00 PM | Ground Floor Panels | 2nd Floor Conference | Electrical/Mechanical Interviews |
| 2:00-5:00 PM | 1st Floor Technical | 3rd Floor Technical | Civil/C&I Live Tests |
| 5:00-6:00 PM | HR Final Round | Offer Discussions | Selection Announcements |
Mumbai: Powai Lake view office (metro 2 km). Gurugram: Cyber Hub (5 min walk).
L&T-S&L Company Profile (Power Engineering Leader)
| Aspect | Details |
|---|---|
| Established | 1995 (L&T + Sargent & Lundy USA JV) |
| Expertise | Power plant FEED+Detail Engineering (157 GW S&L legacy) |
| Clients | NTPC, SECI, Adani Power, Tata Power |
| Projects | 100+ thermal, 50+ renewable, 30+ T&D |
| Offices | Mumbai (HO), Gurugram, Chennai, Vadodara |
| Employees | 2500+ engineers (80% power specialized) |
Sargent & Lundy USA: Designed world’s largest power capacity (157 GW).
Technical Positions & Skill Requirements
| Discipline | Must-Know Software | Core Responsibilities | Experience Priority |
|---|---|---|---|
| Electrical | ETAP 20+, PSS E, DIgSILENT | Power system studies, relay coordination | 765kV substations, SLDs |
| Civil | STAAD.Pro Connect, ETABS | Boiler/turbine foundation design | 800 MW unit foundations |
| Mechanical | PV Elite, Caesar II | Steam generator sizing, piping stress | HRSG, GTG specifications |
| C&I | EPLAN, SmartPlant | DCS architecture, instrument index | ABB/Yokogawa systems |
Global Standards: IEEE, IEC, NFPA mandatory knowledge.
What to Carry (Technical Portfolio Checklist)
| Documents (Original + 2 Copies) | Digital Portfolio | Dress Code |
|---|---|---|
| B.Tech/M.Tech marksheets | ETAP load flow studies | Formal Shirt+Tie |
| Experience certificates | STAAD foundation models | Black Trouser+Shoes |
| GATE Scorecard | P&ID samples (10 pages) | Leather Portfolio Bag |
| Aadhaar/PAN+Photos (6) | SLDs for 400kV+ substations | Name Badge Sticker |
Portfolio Tip: 10 key power projects (MW capacity mentioned).
L&T-S&L Interview Questions (Power Sector Specific)
Electrical Power Systems:
- ETAP load flow convergence issues
- 765kV bus reactor sizing formula
- Distance relay settings Zone-1/2
- PSCAD EMTDC for islanding studies
Civil Plant Foundations:
- ESP foundation dynamic analysis
- Chimney guy wire design IS 4998
- Turbine pedestal temperature reinforcement
- Pile cap design for 500 MW boiler
Mechanical Equipment:
- HRSG pressure part sizing
- Steam turbine blade cooling methods
- Coal mill capacity calculations
- GTG inlet air filter pressure drop
Salary Structure (L&T Group Standards)
| Level | CTC Range | In-Hand Monthly | Key Benefits |
|---|---|---|---|
| Lead/Sr Manager | ₹25-35 LPA | ₹1.8-2.5 Lakh | Variable DA, LTC |
| Manager | ₹20-28 LPA | ₹1.4-2 Lakh | Medical (family) |
| Sr Engineer | ₹16-22 LPA | ₹1.1-1.6 Lakh | L&T Club membership |
| Design Engineer | ₹12-18 LPA | ₹85k-1.3 Lakh | Training at S&L Chicago |
Gurugram Perks: Company leased apartments (₹12k 2BHK).
Why L&T-S&L Beats TBEA/Megha (Power Design)
| L&T-S&L | TBEA China | Megha Engineering |
|---|---|---|
| L&T Group security | EPC contractor | Private infra |
| S&L USA technology | Local adaptation | Basic design |
| Global projects | India focus | Site execution |
| ₹30 LPA max | ₹25 LPA | ₹22 LPA |
| Design office | Mixed execution | Field engineers |
Clientele: World’s top 10 power utilities.
Mumbai & Gurugram Venue Logistics
Mumbai Powai Office:
textAddress: Gate No. 1, L&T-S&L, Powai
Metro: Saki Naka (Orange Line) 1.5 km
Parking: Free basement (arrive by 8:30)
Canteen: ₹50 power engineer thali
Interview Rooms: 20 parallel panels
Gurugram Cyber City:
textDLF Atria Phase 2, Ground+2 Floors
Rapid Metro: Cyber City (2 min walk)
Food Court: 100m (₹80 meals)
Expected Crowd: 400 engineers
Fresher/GATE Strategy (0-3 Years)
Leverage:
textGATE EE/ME rank under 1000
B.Tech project: Power plant model
Internship: NTPC/BHEL/TPDDL
Power system elective coursework
Target: Design Engineer ₹14-18 LPA start.
Experienced Professionals Edge (8+ Years)
Highlight:
text400kV+ GIS substation design
Supercritical boiler foundation work
CCPP HRSG engineering packages
Power system studies (ETAP verified)
Target: Lead Engineer ₹25+ LPA.
Resume Keywords (L&T-S&L ATS Must-Haves)
Technical Terms:
textETAP PowerFactory, DIgSILENT Grid, PSS E
STAAD.Pro Plant Module, GT STRUDL
ASME Section VIII, API 650 tank design
IEEE 80 substation grounding, IEC 61850
Quantified Achievements:
text"Designed 800 MW unit foundations (STAAD verified)"
"ETAP studies for 2000 MW CCPP complex"
"Certified 500km EHV transmission SLDs"
Post-Selection Career Path
textDesign Engineer → Sr Engineer (2 yrs)
→ Lead → Manager (5 yrs) → DGM (10 yrs)
→ GM Power Systems → Regional Head
Global Exposure: S&L Chicago training (3 months paid).
Success Stories (Real L&T-S&L Hires)
Amit S (Electrical, 7 Yrs):
textJan 2025 Powai → Lead ₹26 LPA
Key: 765kV ETAP model experience
Interview: Live relay coordination demo
Priya R (Civil, GATE 2024):
textGurugram Walk-in → Design Eng ₹16 LPA
Portfolio: NTPC internship foundation design
Common Walk-In Mistakes (Avoid!)
| Mistake | Impact | Fix |
|---|---|---|
| No power exp | 1st round rejection | Highlight ANY thermal/renewable |
| Casual attire | Poor impression | L&T formal compulsory |
| Weak portfolio | Technical fail | 10 verified power projects |
| Late arrival | No registration | 8:30 AM both venues |
| Salary fear | Undervalued | Benchmark L&T Realty rates |
Action Plan TODAY (Jan 24)
IMMEDIATE PREP:
✅ Portfolio finalize (10 power projects)
✅ Resume keywords (ETAP/STAAD heavy)
✅ Travel booking (Mumbai/Gurugram)
✅ Venue Google Maps (Powai/Cyber City)
✅ Accommodation (Powai OYO ₹900)
Next 6 Days:
textDaily ETAP/STAAD revision (2 hrs)
Power plant basics (1 hr)
Mock interviews (30 min)
Travel finalized (choose 1 venue)
Why L&T-S&L Power Design 2026 (Strategic)
India Power Reality:
text50 GW thermal pipeline (govt push)
100 GW renewable FEED (SECI tenders)
T&D saturation (400kV+ substations)
L&T-S&L Order Book: ₹8000 Cr design
Global Edge: S&L USA technology transfer.
Telegram Groups (Power Engineering)
textL&T-S&L Careers (20k members)
Power Plant Design (25k)
ETAP Engineers India (12k)
Gurugram Power Hub (15k)
Live vacancy updates + technical question banks.
Final Words – L&T-S&L Jan 31 Golden Opportunity
100+ design roles = peak power engineering hiring!
₹30 LPA max for ETAP/STAAD experts.
L&T Group security + S&L USA technology.
Global project exposure from Day 1.
Mumbai/Gurugram offices = premium lifestyle.
My students clearing L&T-S&L: All carried verified power plant portfolios, mastered ETAP load flow, negotiated confidently. 157 GW S&L legacy = instant global credibility!
Venue Links:
textMumbai Powai: L&T-S&L Gate 1 Sector 1
Gurugram: DLF Atria Cyber City Phase 2
Company Site: lntsnl.com/careers
Power engineers India—questions below. ETAP power system studies + STAAD plant foundations = L&T-S&L Lead confirmed Jan 31!